News, views and advertising of the Grand Coulee Dam Area

Sixty-five years ago

Bureau diver D.S. "Spud" O'Donnell; right; and tender; Glen Eggleston; taking soundings in the prepakt concrete placing area around the base of the right powerhouse training wall of GCD. The grout will be pumped through the vertical pipes which are placed on 5-foot centers over the whole area to be grouted. This work is being done by the Pacific Bridge Company; contractors; as part of their contract. March 1949

 

Reader Comments(0)