News, views and advertising of the Grand Coulee Dam Area
Workmen preparing to construct an ice deflector on the left training wall. When completed, the deflector will divert the ice that slides down the top of the training wall out into the river, lessening possible damage to electrical equipment on the transformer deck below.
-Dec. 6, 1948 photo
Reader Comments(0)