News, views and advertising of the Grand Coulee Dam Area
Noxious Weed Control Board of Grant County
PUBLIC NOTICE
Noxious weed consultants of the Noxious Weed Control Board of Grant County will begin inspecting properties on March 1, 2017, in accordance with RCW 17.10.160, for the purposes of general inspection, the taking of specimens of weeds, and the performance of eradication or control work. If there is any landowner who objects to these inspections, please notify the Noxious Weed Control Board of Grant County at (509) 754-2011, Ext. 4710, or (800) 572-0119, Ext. 4710, by March 1, 2017.
Signed: Ron Tebow, Chairman
Rich Callahan, Vice-Chairman
Summer Sahli, Director
Chuck Sandmann, Director
Wes Sieg, Director
(Publish February 15, 2017)
Noxious Weed Control Board of Grant County
PUBLIC NOTICE
The Grant County roadside spray program will begin approximately March 1, 2017. The roadside spray contractor is Basin Tree Service and Pest Control, Inc. of Ephrata, Washington. An applicator of the Noxious Weed Control Board of Grant County will spot spray as necessary. For questions, please contact the Noxious Weed Control Board of Grant County at (509) 754-2011, Ext. 4710, or (800) 572-0119, Ext. 4710.
Signed: Ron Tebow, Chairman
Rich Callahan, Vice-Chairman
Summer Sahli, Director
Chuck Sandmann, Director
Wes Sieg, Director
(Publish February 15, 2017)
City of
Electric City
NOTICE OF
APPLICATION FOR SHORT
SUBDIVISION
The City of Electric City has received an application for a SHORT SUBDIVISION on the project listed below. This public notice is consistent with the requirements of ECMC Chapter 19.07.070. This notice is only intended to inform all interested parties of the proposed project and to seek comments from the public. It does not indicate approval of the proposed project. Comments will be taken until March 1, 2017. Date of Application: December 18, 2016, Determination of Completeness: February 7, 2017
Notice of Application: February 15, 2017, Applicant: Kenneth Anderson, Address: 205 Sunny Dr., Electric City, WA 99123. Legal Description: LOTS 9-15 & E 5’ LT 16 & POR BLK 1 ELECTRIC CITY 1ST ADD (UNRECORDED) IN S1/2SE 9 28 30. Project Description: The applicant submitted a preliminary short plat application requesting that a .515 acre parcel be subdivided into two (2) residential lots within the Residential (R3) Zone. Any person has the right to comment on this application, receive notice of and participate in any hearings, and request a copy of the decision once made, and a statement of any appeal rights. Comments can be directed in writing to the City of Electric City for 14 days after the date of this notice at: P.O. Box 130, Electric City, WA 99123.
Russ Powers
(Publish February 15, 2017)
Public Hospital District #6
PUBLIC NOTICE OF CHANGE
OF MEETING DATE
The regularly scheduled Public Hospital District #6 Douglas, Grant, Lincoln & Okanogan Counties Board of Commissioners scheduled for February 27, will be held on Thursday, March 2, 2017 at 6:00 p.m. in the Public Conference Room of Coulee Medical Center.
(Publish February 15, 2017)
ADVERTISEMENT FOR BIDS
TOWN OF COULEE DAM
WASTEWATER TREATMENT PLANT IMPROVEMENT PROJECT
Separate sealed bids will be received by the Town of Coulee Dam at the Town Hall, located at 300 Lincoln Ave, Coulee Dam, WA 99116, until 2:00 p.m., March 15, 2017, and publicly opened and read aloud at that time.
The CONTRACT DOCUMENTS may be examined at the following locations.
1. Town of Coulee Dam, 300 Lincoln Ave, Coulee Dam, WA 99116
(509) 633-0320
2. Varela & Associates, Inc., 601 W. Mallon Ave Ste A,
Spokane, WA 99201 (509) 328-6066
3. Various plan centers - call Varela & Associates
or visit http://www.varela-engr.com for list.
This work is for construction of a new 195,000 gpd extended aeration wastewater treatment plant for the Town of Coulee Dam, WA. Major elements of the work include: earthwork, site improvements, concrete process basins, supply and installation of process equipment, process and operations buildings, sludge dewatering system, electrical, controls, and decommissioning of existing treatment facilities.
The project is located within the Town of Coulee Dam town limits, rights-of-way and easements.
Proposals must be submitted on the forms provided in the Contract Documents. Bid bonds in an amount not less than 5 percent of the amount bid are to be made payable to the Town of Coulee Dam. 100 percent performance and payment bonds will be required from the successful bidder.
The Town of Coulee Dam is an equal opportunity and affirmative action employer. Disadvantaged, tribal-, minority- and women-owned businesses are encouraged to submit bids. All work performed on this project will be subject to prevailing state wage rates. The project is funded by a grant/loan from the United States Department of Agriculture Rural Development program.
The Town of Coulee Dam reserves the right to reject any and all bids, to waive technicalities, and in its sole judgement, accept the bid which it deems is in its best interest. Additional bid acceptance and contract award provisions are specified in the Contract Documents.
Copies of the CONTRACT DOCUMENTS may be purchased at the office of Varela & Associates, Inc., hereafter referred to as the Issuing Agent, for $60 per set (non-refundable, see address above). For additional information regarding this project, contact Daniel Cowger, P.E., at Varela & Associates, Inc., at (509) 328-6066 or couleedamwwtp@varela-engr.com.
Reader Comments(0)